Scheduling

Scheduling is one of the most critical elements of the construction process. Bringing a project in ‘on-time’ can mean large savings. JKA provides scheduling for all stages of a project. Schedules are prepared to incorporate the client’s specific needs and requirements using both Gantt and CPM charting methods. In the event of a claim, the project schedule provides important evidence for determining responsibility and cause.

Examples of work product prepared by JKA Include:

  • Critical path schedule for new construction / reconstruction
  • Delay / acceleration analysis
  • Productivity analysis
  • Impact / causation evaluations
  • Manpower / resource loading
  • Damage calculation (eg. Home office overhead, Eichleay formula)
  • Two-week lookahead schedule and schedule updates
  • Document review, analysis, and indexed back-up log of documents